Projects
From Concept to Construction and Beyond.
Muglizh Solar & Energy Storage Complex
Solar Capacity: 120 MWac
Battery Storage Capacity: 72 MWh
Battery Power: 36 MW


The Muglizh Solar & Energy Storage Complex is a large-scale renewable energy project combining utility-scale solar generation, battery energy storage, and dedicated grid infrastructure within a single integrated energy platform.
The project includes a 120 MWac photovoltaic power plant developed in multiple phases, supported by a 36 MW / 72 MWh battery energy storage system designed to enhance operational flexibility, optimize energy dispatch, and support grid stability.
To ensure reliable integration into Bulgaria's electricity transmission network, the development also incorporates substantial grid infrastructure, including the reconstruction of Substation Dabovo, a dedicated 33/110 kV step-up substation, a new 110 kV grid connection, and associated transmission facilities.
The integrated complex contributes to the decarbonization of the Bulgarian energy sector while strengthening the reliability and resilience of the national power system. The successful delivery of the project demonstrates 360 Energy's expertise in developing utility-scale renewable generation, energy storage solutions, and high-voltage grid infrastructure within a single coordinated investment.

Empower
Growth


Verila Solar Expansion & Battery Energy Storage System
150 MWp​
​

The Verila Solar PV Expansion and Battery Energy Storage System marks the next stage in the development of the Verila renewable energy complex in Bulgaria. Following the commissioning of the existing 100 MWac Verila photovoltaic power plant, the project adds a further 50 MW of solar capacity, together with a 45 MW / 90 MWh battery energy storage system.
Located near the village of Kraynitsi, Dupnitsa Municipality, the project also includes the reconstruction and upgrade of related grid infrastructure, including the Kraynitsi 33/110 kV substation, supporting the efficient integration of the new solar and storage capacities into the electricity system.
By combining large-scale solar generation with advanced battery storage, the project enhances grid flexibility, improves energy balancing capabilities, and supports the wider integration of renewable energy in Bulgaria. The successful completion of this expansion demonstrates 360 Energy’s continued commitment to delivering complex renewable energy infrastructure and supporting the transition towards a more resilient, sustainable, and low-carbon energy system.



Verila Standalone Battery Energy Storage System
Storage Capacity: 357.8 MWh
Installed Power: 100.62 MW

The Verila Standalone Battery Energy Storage System (BESS) is one of the largest utility-scale energy storage projects in Southeast Europe, designed to enhance grid flexibility and support the integration of renewable energy sources into the national electricity system.
Located in Kraynitsi, Dupnitsa Municipality, the facility delivers 100.62 MW of installed power and 357.8 MWh of energy storage capacity. The project includes a dedicated 110/33 kV step-up substation, a 110 kV grid connection line, and direct integration with the ESO SCADA/EMS control systems, ensuring reliable participation in power system operations.
The project strengthens the resilience and stability of the Bulgarian power network by providing fast-response balancing services, improved operational flexibility, and enhanced support for the growing share of renewable energy generation. The successful commissioning of the facility demonstrates 360 Energy's capability to develop and deliver large-scale energy storage infrastructure that supports the transition towards a modern, secure, and low-carbon energy system.

PV Resen
5+1.8 MWp​
​